|
Operations - North America
Canada

Alberta
Taber
- Two sections of land
- Production of 75 bbls/d
- 100% owned facilities - central batteries, tanks, water handling facilities and flow lines
- Long reserve life index of 8 years
- Extensive 3D seismic coverage over the properties
- 100% working interest, decreasing to 75% after farmout commitment ($1.6 million to drill up to 3 wells)
- Mature medium gravity oil – Glauconite Zone, 1000 m depth
- Strategic and partner to drill up to three wells in 2010, commencing in Q2
Conrad
- Over 13 key sections of land (providing over 10 possible drilling locations)
- Current production of 70 bbls/d
- Long reserve life index of 8 years
- Incremental oil production is expected to be added from workovers, pump changes, selective drilling and enhanced recovery methods
- First vertical well drilled at North Conrad (11-23) - Sawtooth Formation, 1,000 m depth (20-30 bbls/d)
- Horizontal well has been planned for the second quarter of 2010, could provide additional production of approximately 80 bbls/day
Pembina
- Multi-zone oil and natural gas potential
- Glauconite, Ellerslie, and Rock Creek opportunities being developed with the ability to expand in area
- Near existing infrastructure
- Proven Cardium oil and natural gas production
- Potential for horizontal Cardium wells in 2010
Harmattan
- Two sections of land
- Multi-zone potential – Cardium, Glauconite, Elkton, Shunda (2500m)
- Two producing wells
- Liquids rich natural gas
- Additional 2-3 locations have been identified to be drilled at low risk with
high production potential, including horizontal Cardium wells
British Columbia
Maxhamish Play
- Located in northeastern BC
- Farm-in signed January 2009
- Partnership agreement put in place November 2009
- Over 80 sections of land
- Infrastructure in place
- Earn 25% interest in 5 producing wells
- Additional election points for future drilling/commitments
- Earning four sections/well drilled
- BC infrastructure incentive, royalty friendly regime
- Current focus on horizontal oil project with large upside
- Two wells drilled and cmpleted March 2010
- Low cost entry into a high impact resource play
|
|